Share
Project Description
MacKay Contracting was selected by CP Rail to construct the Red Deer Siding as part of the Red Deer Terminal Capacity Expansion.
This was a challenging project in terms of accessibility as the site was located in a dense urban area. As this project was the length of the Red Deer Terminal, developing strategies to mitigate schedule impacts due to the high volume of rail traffic were vital to the success of this project.