![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_1033-1024x768.jpg)
![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_1035-1024x768.jpg)
![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_1036-1024x768.jpg)
![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_1053-1024x768.jpg)
![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_1887-1024x768.jpg)
![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_2019-1024x768.jpg)
![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_2022-1024x768.jpg)
![](https://mackaycontracting.com/wp-content/uploads/2024/12/IMG_2290-1024x768.jpg)
Project Description
MacKay was selected for the South Tailings Pond to Turnbull South Pit (STP-TBS) Tailings pipeline project.
Project Highlights
- 180,000m3 earthworks, 2000m3 rip-rap
- 5km HDPE tailings pipeline, 500mm-400mm diameter DR7.3-DR17
- Containment berms along entire pipeline route
- 0.75 150mm DR17 gland water line
- Above ground installation and testing
- Work performed in extreme conditions in an extremely busy mine
- 24 steel pipe crossings under active haul roads and active rail line
Project Details
- Date: 2015 – 2016