Skip to main content

Project Description

In 2016 MacKay was awarded the Idlewild Lake Dam Upgrades project. This work was performed in an active and well-used park, requiring a great deal of communication and interaction with the public.

Project Highlights

  • Constructing new cast-in-place concrete spillway structure with low-level outlet
  • New 5km bypass piping system including intake and weir
  • Rip-rap embankment and stilling basin
  • Decommissioning existing spillway and bypass piping system

Project Details

  • Client: City of Cranbrook
  • Value: $1.6M
  • Date: 2017 – 2017
MacKay Contracting

Author MacKay Contracting

More posts by MacKay Contracting