Project Description
In 2016 MacKay was awarded the Idlewild Lake Dam Upgrades project. This work was performed in an active and well-used park, requiring a great deal of communication and interaction with the public.
Project Highlights
- Constructing new cast-in-place concrete spillway structure with low-level outlet
- New 5km bypass piping system including intake and weir
- Rip-rap embankment and stilling basin
- Decommissioning existing spillway and bypass piping system
Project Details
- Client: City of Cranbrook
- Value: $1.6M
- Date: 2017 – 2017